SOP for Operational Check of Disintegration Test Apparatus
1.0 OBJECTIVE :
To check operation of the equipment for reliable and accurate results.
2.0 SCOPE :
This procedure is applicable to disintegration test apparatus installed at quality control department.
[ads id="ads1"]
3.0 RESPONSIBILITY :
3.1 Doing : Technical Assistant/ Executive
3.2 Checking : Executive /Asst.Manager
4.0 ACCOUNTABILITY :
4.1 Head of the department.
5.0 PROCEDURE :
Frequency : Once in a month
5.1 Operate the instrument as per Standard operating procedure.
5.2 When indicator display 37°C, measure the temperature of individual beaker with thermometer.
5.3 Record the number of up down cycles per minute. Note down four reading & record the result in Annexure-I
5.4 Measure the Osillation and record the result in Annexure-I
5.5 If the instrument out of limit as in Annexure – I, follow the SOP.
[ads id="ads1"]
6.0 ABBREVIATIONS :
°C = Degree Centigrade
[ads id="ads1"]