SOP for Operational Check of Disintegration Test Apparatus

1.0 OBJECTIVE :

To check operation of the equipment for reliable and accurate results.

2.0 SCOPE :

This procedure is applicable to disintegration test apparatus installed at quality control department.

[ads id="ads1"]

3.0 RESPONSIBILITY :

3.1 Doing : Technical Assistant/ Executive

3.2 Checking : Executive /Asst.Manager

4.0 ACCOUNTABILITY :

4.1 Head of the department.

5.0 PROCEDURE :

Frequency : Once in a month

5.1 Operate the instrument as per Standard operating procedure.

5.2 When indicator display 37°C, measure the temperature of individual beaker with thermometer.

5.3 Record the number of up down cycles per minute. Note down four reading & record the result in Annexure-I

5.4 Measure the Osillation and record the result in Annexure-I

5.5 If the instrument out of limit as in Annexure – I, follow the SOP.

[ads id="ads1"]

6.0 ABBREVIATIONS :

°C = Degree Centigrade